Paladin Energy —
Langer Heinrich
Uranium Mine

Major Uranium Mine Restart in the Namib Desert

Langer Heinrich Mine

Langer Heinrich Mine — Namibia

Bara Consulting provided mining engineering and technical planning support for the Langer Heinrich uranium operation in Namibia on behalf of Paladin Energy. One of Namibia’s most established uranium operations, Langer Heinrich was placed on care and maintenance in 2018 and successfully restarted in 2024. ~84.2 Mlb U₃O₈ mineral resource. ~66.2 Mlb proven & probable reserves. ~6 Mlb U₃O₈/year nameplate production. 17+ year mine life.

Paladin Energy

Uranium

Erongo Region, Namibia

Uranium Mine Restart & Operational Planning Support

About the Langer Heinrich Mine

The Langer Heinrich Mine, operated by Paladin Energy, is one of Namibia’s most established uranium mining operations. It is located in the Erongo Region within the Namib Desert, a globally significant uranium-producing district.

The mine has a long history as a major global uranium producer. It was placed on care and maintenance in 2018 due to depressed uranium prices and later successfully restarted in 2024 following improved uranium market conditions and renewed demand from the nuclear energy sector.

Bara Consulting provided mining engineering and technical advisory services supporting mine planning, scheduling, and operational studies during the restart and optimisation phases of the operation.

Bara Consulting Scope of Work

  • Open-pit mine planning and scheduling
  • Open-pit mine design support
  • Production planning and forecasting
  • Operational optimisation studies
  • Mining strategy evaluation and scenario analysis
  • Life-of-mine planning support
  • Technical and economic evaluation inputs

Project Outcomes

The work supported key operational planning activities associated with the successful restart of the Langer Heinrich Mine and contributed to the mine’s transition back into production. The restart represents one of the most significant uranium mine restarts globally in recent years, occurring during a period of strengthening uranium prices and increased demand for nuclear fuel supply.

Project Statistics

ItemDetail
ClientPaladin Energy
ProjectLanger Heinrich Mine
LocationErongo Region, Namibia
CommodityUranium
Project TypeUranium Mine Restart & Operational Planning Support
Bara ServicesMine Planning, Scheduling, Operational Support, Technical Studies
Mining MethodOpen-pit Mining
Processing MethodConventional Uranium Processing
OwnershipPaladin Energy Ltd
Original Production Start2007
Care & Maintenance2018
Restart Production2024
Mineral Resource~84.2 Mlb U₃O₈
Proven & Probable Reserves~66.2 Mlb U₃O₈
Nameplate Production~6 Mlb U₃O₈ per annum
Mine Life17+ years
Country ImportanceOne of Namibia’s major uranium operations
SectorNuclear Fuel / Critical Minerals

Studies

Modern mechanised underground gold mine development near Johannesburg. Lead independent mining engineering consultant for the DFS. ~70,000 oz Au per annum over a 17-year mine life. First gold 2026.

Underground tin, tungsten and tantalum mining across Musha, Nyakabingo and Rutongo operations in Rwanda. Mine planning, design and feasibility study support across a critical minerals portfolio.

Underground mining evaluation for the Bibiani Gold Mine in Ghana’s Sefwi Gold Belt. Concept mine design, scheduling, infrastructure review and technical-economic evaluation for future underground redevelopment.

Contact Us