Major Uranium Mine Restart in the Namib Desert
Bara Consulting provided mining engineering and technical planning support for the Langer Heinrich uranium operation in Namibia on behalf of Paladin Energy. One of Namibia’s most established uranium operations, Langer Heinrich was placed on care and maintenance in 2018 and successfully restarted in 2024. ~84.2 Mlb U₃O₈ mineral resource. ~66.2 Mlb proven & probable reserves. ~6 Mlb U₃O₈/year nameplate production. 17+ year mine life.
Paladin Energy
Uranium
Erongo Region, Namibia
Uranium Mine Restart & Operational Planning Support
The Langer Heinrich Mine, operated by Paladin Energy, is one of Namibia’s most established uranium mining operations. It is located in the Erongo Region within the Namib Desert, a globally significant uranium-producing district.
The mine has a long history as a major global uranium producer. It was placed on care and maintenance in 2018 due to depressed uranium prices and later successfully restarted in 2024 following improved uranium market conditions and renewed demand from the nuclear energy sector.
Bara Consulting provided mining engineering and technical advisory services supporting mine planning, scheduling, and operational studies during the restart and optimisation phases of the operation.
The work supported key operational planning activities associated with the successful restart of the Langer Heinrich Mine and contributed to the mine’s transition back into production. The restart represents one of the most significant uranium mine restarts globally in recent years, occurring during a period of strengthening uranium prices and increased demand for nuclear fuel supply.
| Item | Detail |
|---|---|
| Client | Paladin Energy |
| Project | Langer Heinrich Mine |
| Location | Erongo Region, Namibia |
| Commodity | Uranium |
| Project Type | Uranium Mine Restart & Operational Planning Support |
| Bara Services | Mine Planning, Scheduling, Operational Support, Technical Studies |
| Mining Method | Open-pit Mining |
| Processing Method | Conventional Uranium Processing |
| Ownership | Paladin Energy Ltd |
| Original Production Start | 2007 |
| Care & Maintenance | 2018 |
| Restart Production | 2024 |
| Mineral Resource | ~84.2 Mlb U₃O₈ |
| Proven & Probable Reserves | ~66.2 Mlb U₃O₈ |
| Nameplate Production | ~6 Mlb U₃O₈ per annum |
| Mine Life | 17+ years |
| Country Importance | One of Namibia’s major uranium operations |
| Sector | Nuclear Fuel / Critical Minerals |
Modern mechanised underground gold mine development near Johannesburg. Lead independent mining engineering consultant for the DFS. ~70,000 oz Au per annum over a 17-year mine life. First gold 2026.
Underground tin, tungsten and tantalum mining across Musha, Nyakabingo and Rutongo operations in Rwanda. Mine planning, design and feasibility study support across a critical minerals portfolio.
Underground mining evaluation for the Bibiani Gold Mine in Ghana’s Sefwi Gold Belt. Concept mine design, scheduling, infrastructure review and technical-economic evaluation for future underground redevelopment.
Copyright © 2026. All rights reserved.